Cisco Campus Network Project
The project started during the construction Rare Campus of the University, the projected total 6000 Ethernet terminal withdrawal, the end of the entering into 9 different subsystems rooms and 9 collection system room of one master room on the backbone switch the device on is provided.
The campus is only used throughout Cisco devices. At Cisco 6509 backbone switches, edge switches in the Cisco 3560 and 2960 devices are used.
Network planning, implementation and post-installation services are provided.