I was involved with the HPE team in the implementation of the tool which included steps like zone grade configuration, tape grade configuration, etc. The zoning part during implementation was very cumbersome. The tool’s implementation took around one week maximum to complete. One person from the HPE team helped us with the deployment. The tool’s deployment was a big process. We had to first deploy the hardware. Then we needed to connect it to the server. We had to also install HPE’s Data Protector. There were multiple things to be configured such as the configuration of Data Protector with D2D backup.